TJ's Desk

Draft. This note is unfinished and unlisted. It can change or disappear, so please do not share it yet. All drafts

I Trust the Number. I Do Not Trust What I Say About It.

I manage a team and I measure a lot of things. The counting has never been what went wrong. Every time I got hurt, it was by the sentence I attached to the count.

measurement leadership workflow

One of my checks ran once in 165 sessions. That number was correct, and I still managed to be wrong about it for most of a day.

I had built a check that fires when I sit down to work, rolled it out across my repositories, and written a note saying it ran everywhere. Three weeks later I finally counted. In my biggest project it had run one time. I looked at that and wrote myself a thoughtful theory about discipline and habit. Then I ran the check by hand from the wrong folder and watched it fail to find its own program. It had never been able to start. The long version is in The Check Ran Once in 165 Sessions.

The count was fine. The story I hung on it was invented, and it survived because it was plausible and nobody ran the one command that would have killed it. That is most of what I believe about metrics now.

A measurement tells me what happened. It has never once told me why.

A number is where I start asking

Before I had data on my team I had opinions about how the team was doing, and I was fairly comfortable with them, which should have been the warning. Then I set up Apache DevLake and had a lake of real figures for cycle time and review time. The dashboards were the part I expected to keep. What I kept was the set of queries that said exactly what each number counted. When I later built my own team view, those definitions became its spec, and I checked its figures against DevLake's before I trusted either. That story is in I Showed My Team a Dashboard.

So the first thing I ask of a metric is what it counts, precisely enough that two people would get the same answer. A number without a definition is an opinion wearing a lab coat.

The second thing I ask is what it cannot see. A pull request merged as written and a pull request merged after somebody rewrote half of it look the same in every standard figure. They are different outcomes. If the number I am looking at cannot tell those two apart, I go and read the pull requests.

Figure: one count, two stories. The same bar (one run in 165 sessions) with the reason I wrote down on the left and the reason that was true on the right. To be drawn to the FIGURES scaffold before this leaves DRAFT.

The rule about people

Individual numbers never feed a performance review. They roll up to the team. That is the rule I gave other organizations in Build the Floor, and the reason is plain: the moment people suspect otherwise, I am measuring how well they game the count and I have lost the thing I wanted to know.

[Only you can write this part: whether the rule is written down for your own team, what it has cost you, and a time a number about a person tempted you.]

A report that only improves

My pull request reviewer scores every finding it posts by what happened next. That log is the reason I trust it, and it is also the reason I can say what I have not shown. I know which comments people acted on. I do not know that the codebase got better, because that is a longer study than three months and I have not run it. Both sentences come out of the same log, and I think a metric has done its job when it gives me the second one as readily as the first. The Reviewer That Learned to Be Wrong has the receipts.

I have started to distrust any report of mine that only goes up. Either I picked a number that cannot go down, or I stopped looking on the bad weeks. When I wrote up how an organization should measure its AI adoption, the line I cared most about was the plain one: report the numbers that went the wrong way, because a report that only ever improves stops being read.

What I have not earned

I am better at measuring my tools than at measuring myself. I can tell you how often a check ran and how many review comments landed. I cannot tell you with a number whether I am a better manager than I was a year ago, and I am suspicious of anyone who can.

[Optional: one number you do keep on yourself, if there is one, and whether you believe it.]

So here is what metrics mean to me. I trust the count. I hold the sentence after it loosely, I write down what the count cannot see, and before I act on any of it I go and run the command.

Once in 165 sessions was true the whole time. I was the part that needed checking.


The judgment is human. The typing, by design, is not.